Decision

URL: https://democracy.north-herts.gov.uk/ieDecisionDetails.aspx?ID=7239

Decision Maker: Planning Control Committee

Outcome:

Is Key Decision?: No

Is Callable In?: No

Purpose:

Content: RESOLVED: That application 24/02889/FP be GRANTED planning permission subject to the reasons and conditions set out in the report of the Development and Conservation Manager, with the removal of clause (A), the addition of Conditions 50 to 53 and related Informative,  the amendments to Conditions 3 to 5, Condition 16, Condition 18, Condition 23, Condition 25, Condition 35, Condition 36, and the combining of Conditions 27 and 49, as follows:   ‘Condition 50   All development shall be constructed in accordance with the submitted and approved Flood Risk Assessment (dated 6 December 2024), this includes all new residential dwellings to have a finished floor level raised a minimum of 300mm above any flood level and 150mm above the surrounding proposed ground level unless otherwise first approved in writing by the Local Planning Authority.   Reason: To ensure the flood risk is adequately addressed and not increased in accordance with NPPF and Policies of North Herts Council.   Condition 51   Prior to the commencement of development, construction drawings of the surface water drainage network, associated sustainable drainage components and flow control mechanisms and a construction method statement shall be submitted and agreed in writing by the local planning authority. The scheme shall then be constructed as per the agreed drawings, method statement, Flood Risk Assessment (dated 6 December 2024) and Technical Memorandum (dated 23 May 2025) and remaining in perpetuity for the lifetime of the development unless agreed in writing by the Local Planning Authority. No alteration to the Page 3 Agenda Item 5 agreed drainage scheme shall occur without prior written approval from the Local Authority.   Reason: To ensure that the development achieves a high standard of sustainability and to comply with NPPF Policies of North Herts Council.   Condition 52   The development hereby approved shall not be occupied until details of the maintenance and management of the sustainable drainage scheme have been submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall be implemented prior to the first occupation of the development hereby approved and thereafter managed and maintained in accordance with the approved details in perpetuity. The Local Planning Authority shall be granted access to inspect the sustainable drainage scheme for the lifetime of the development. The details of the scheme to be submitted for approval shall include:   I.             a timetable for its implementation II.           II. details of SuDS feature and connecting drainage structures and maintenance requirement for each aspect including a drawing showing where they are located. III.          a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the operation of the sustainable drainage scheme throughout its lifetime. This will include the name and contact details of any appointed management company.   Reason: To ensure that the development achieves a high standard of sustainability and ensure the flood risk is adequately addressed for each new dwelling and not increased in accordance with NPPF and Policies of North Herts Council.   Condition 53   Upon completion of the surface water drainage system, including any SuDS features, and prior to the first use of the development; a survey and verification report from an independent surveyor shall be submitted to and approved in writing by the Local Planning Authority. The survey and report shall demonstrate that the surface water drainage system has been constructed in accordance with the details approved pursuant to condition 51. Where necessary, details of corrective works to be carried out along with a timetable for their completion, shall be included for approval in writing by the Local Planning Authority. Any corrective works required shall be carried out in accordance with the approved timetable and subsequently re-surveyed with the findings submitted to and approved in writing by the Local Planning Authority.   Reason: To ensure the flood risk is adequately addressed, not increased and users remain safe for the lifetime of the development in accordance with NPPF and Policies of North Herts Council.   Informative   “For further advice on what we expect to be contained within the FRA and/ or a Drainage Strategy to support a planning application, please refer to the Validation List and Profroma on our surface water drainage webpage https://www.hertfordshire.gov.uk/services/recycling-waste-and-environment/water/surface-water-drainage/surface-water-drainage.aspx this link also includes HCC’s Flood Risk Management policies on SuDS in Hertfordshire. We do expect the Validation List to be submitted to the Local Planning Authority and LLFA to show you have provided all information and the Proforma to the LLFA to summarise the details of the proposed development.   Both FEH13 and FEH22 are currently accepted to support drainage modelling calculations. For the avoidance of doubt the use of FSR and FEH1999 data has been superseded and therefore, use in rainfall simulations are not accepted.”   Condition 3   “Highways   No development shall commence until full details (in the form of scaled plans and / or written specifications) have been submitted to and approved in writing by the Local Planning Authority to illustrate the following:        i.        Roads, footways.     ii.        Cycleways.   iii.        Foul and surface water drainage.   iv.        Visibility splays    v.        Access arrangements   vi.        Parking provision in accordance with parking locations plan DES-716-110 Rev 3  vii.        Loading areas. viii.        Turning areas.   Reason: To ensure suitable, safe and satisfactory planning and development of the site in accordance with Policy 5 of Hertfordshire’s Local Transport Plan (adopted 2018).”   Condition 4   “Prior to the first occupation of the development hereby permitted the vehicular and active travel accesses shall be completed and thereafter retained as shown on Transport Assessment drawing numbers (PL101 Rev - , PL102 Rev - & PL103 Rev ) in accordance with details/specifications to be submitted to and approved in writing by the Local Planning Authority in consultation with the highway authority. Prior to use appropriate arrangements shall be made for surface water to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.   Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire’s Local Transport Plan (adopted 2018).”   Condition 5    “Surface Water   Prior to first occupation of the development hereby permitted, arrangement shall be made for surface water from the proposed development to be intercepted and disposed of separately so that it does not discharge onto the highway carriageway. Reason: To avoid the carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire’s Local Transport Plan (adopted 2018).”   Reason: To avoid the carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire’s Local Transport Plan (adopted 2018).”   Condition 16   “Ecological Enhancements   No development shall take place until an Ecological Enhancement Plan (EEP) for the creation of new wildlife features such as hibernacula, the inclusion of integrated bird/bat and bee bricks, at a rate equivalent to one per unit, in buildings/structures and hedgehog holes in fences, as informed by the December 2024 Ecological Impact Assessment, has been submitted to and approved in writing by the local planning authority. The approved Ecological Enhancement Plan shall be implemented on site.   Reason: To conserve and enhance biodiversity in accordance with Policy NE4 of the North Hertfordshire District Local Plan 2011-2031.”   Condition 18   “Fencing   Notwithstanding the approved plans, details of the proposed fencing along the western boundary (adjacent to the woodland) shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented on site and permanently maintained.   Reason: In the interests of ecology and visual impact in accordance with Policies D1 and NE4 of the North Hertfordshire Local Plan.”   Condition 23   “Land contamination   Prior to any permitted dwelling being occupied a validation report shall be submitted and approved in writing by the Local Planning Authority to demonstrate the effectiveness of any agreed Remediation Strategy (agreed under condition 22). Any such validation shall include responses to any unexpected contamination discovered during works.   Reason: To protect human health and to ensure that no future investigation is required under Part 2A of the Environmental Protection Act 1990.”   Condition 25   “Noise   The development shall be constructed in accordance with the submitted plans including the noise mitigation scheme as set out in the submitted MEC Ltd noise assessment report dated March 2025 (25521-ENV-0402 Rev B).   Reason: In the interests of protecting living conditions of future occupiers in accordance with Policy D3 of the North Hertfordshire District Local Plan 2011- 2031.”   Condition 35   “EV charging points plan   Prior to the first occupation of the development hereby approved details of siting, number and design of the Electric Vehicle Charging Points shall have been submitted to and approved in writing by the Local Planning Authority. The approved details shall thereafter be installed prior to the occupation of each dwelling and permanently retained thereafter. Each of the proposed new dwellings shall have an Electric Vehicle (EV) charging point. Proposals should also be made for the provision of EV charging within other public parking areas of the proposed development.   Reason: To avoid obstruction of the footpaths and in the interests of good urban design/visual impact in accordance with Policy D1 of the North Hertfordshire District Local Plan 2011-2031.”   Condition 36   “Cycle parking   No development shall commence until details of the cycle parking in accordance with DES-716-265-0 (Bins and Cycle Storage Plans and Elevations) and DES-716-110-3 Parking Location Plan have been submitted to and approved in writing by the Local Planning Authority. The cycle parking provision shown shall accord with the guidance in LTN 1/20 on Cycle Infrastructure Design as a minimum unless local cycle parking standards are greater. The development or any phase of the development, whichever is the sooner, shall not be occupied until the cycle parking has been constructed and completed in accordance with the approved details and shall thereafter be kept free of obstruction and permanently available for the parking of cycles only.   Reason: To ensure the provision of cycle parking that meets the needs of occupiers of and visitors to the proposed development in compliance with the guidance in the Hertfordshire Place & Movement Planning and Design Guide and LTN1/20 on Cycle Infrastructure Design as a minimum, and in the interests of encouraging the use of sustainable modes of transport in accordance with Policies 1, 5 and 8 of Hertfordshire’s Local Transport Plan (adopted 2018) and in the interests of good urban design/visual impact in accordance with Policy D1 of the North Hertfordshire District Local Plan 2011-2031.”   Condition 27   “Landscape Management Plan   No development above ground level shall take place until a landscape management plan, including long term design objectives, management Page 7 responsibilities and maintenance schedules and periods for all soft landscape areas (other than privately owned domestic gardens) together with a timetable for the implementation of the landscape management plan, has been submitted to and approved in writing by the Local Planning Authority. The landscape management plan shall cover the management and maintenance of all areas of open space (to include parks, greenways, play areas, informal open space, seminatural green space). Details to be submitted shall include:   a)           Management organisation; b)           Details of landscape management and maintenance plans; c)           Details of planting, grass cutting, weeding and pruning; d)           Management of sustainable urban drainage features; e)           Inspection, repair and maintenance of all hard landscaping and structures; f)            Management, monitoring and operational restrictions; and g)           Maintenance and planting replacement programme for the establishment period of landscaping.   The landscape management plan shall be carried out in accordance with the approved details and timetable. The open spaces provided shall be retained for their intended purpose and in accordance with the approved management plan unless otherwise agreed in writing by the Local Planning Authority.   Reason: To ensure the longevity of the landscaping scheme and protect the visual amenity and character of the area, in accordance with Policies SP12, NE6 and GA1 of the North Hertfordshire District Local Plan 2011-2031.’  

Date of Decision: July 24, 2025