Decision

URL: https://democracy.brighton-hove.gov.uk/ieDecisionDetails.aspx?ID=7589

Decision Maker: Cabinet

Outcome:

Is Key Decision?: Yes

Is Callable In?: Yes

Purpose: This report details the upgrades and associated costs, to the Material Recovery Facility to ensure it is operating safely and efficiently to accept the expanded range of recycling materials. 

Content: This report details the upgrades and associated costs, to the Material Recovery Facility to ensure it is operating safely and efficiently to accept the expanded range of recycling materials.  1)             That Cabinet approves the procurement and installation by Veolia of a new optical sorter, chutes, conveyors and bays, along with the associated adaptation works required at the Hollingdean Materials Recovery Facility.   2)             That Cabinet approves a capital budget of £2.3m to be funded by PWLB borrowing.   3)             That Cabinet delegates authority to the Corporate Director for City Operations, in consultation with the Lead Member for Environment and Net Zero , to finalise, approve and enter into any required contractual amendments with Veolia, including agreeing detailed terms of all necessary Deeds of Variation.

Date of Decision: March 19, 2026