Decision

URL: https://democracy.ribblevalley.gov.uk/ieDecisionDetails.aspx?ID=1104

Decision Maker: Planning and Development

Outcome: Recommendations Approved

Is Key Decision?: No

Is Callable In?: No

Purpose:

Content: RESOLVED THAT COMMITTEE:   That planning permission be APPROVED subject to the following conditions:   1.     The development must be begun not later than the expiration of three years beginning with the date of this permission.   REASON: Required to be imposed by Section 51 of the Planning and Compulsory Purchase Act 2004.   2.     Unless explicitly required by condition within this consent, the development hereby permitted shall be carried out in complete accordance with the proposals as detailed on drawings:               Location Plan (1:1250)             Site Plan (dwg no. 10638-P-01 Rev 00)             Fencing Elevation (dwg no. S910638-P-04)             Gate Elevation (dwg no. S910638-P-03)   REASON: For the avoidance of doubt and to clarify which plans are relevant to the consent.   3.     The materials to be used on the external surfaces of the development hereby approved as indicated within the application form and on drawing(s) ‘Fencing Elevation’ (dwg no. S910638-P-04) and ‘Gate Elevation’ (dwg no. S910638-P-03) shall be implemented as indicated.   REASON: In order that the Local Planning Authority may ensure that the materials to be used are appropriate to the locality and respond positively to the inherent character of the area.               4.     All tree works/ tree protection shall be carried out in strict accordance with the submitted Arboricultural Impact Assessment (Report No. 2026_AIA.01), Arboricultural Method Statement (Report No. 2026_AMS.01), Tree Protection Plan (dwg no. 2026_AIA.TPP.01) and British Standard BS 5837:2012.   REASON: To protect trees/ hedging of landscape and visual amenity value on and adjacent to the site or those likely to be affected by the proposed development hereby approved.   5.     During the construction phase of the boundary fencing/gates hereby permitted there shall be no deliveries to site or removal of existing materials from site before 9:30am and between 3:00pm and 4:00pm Monday to Friday during school term time.   REASON: In the interest of protecting residential amenity and to ensure the safe operation of the Highway for the duration of the construction phase of the development.  

Date of Decision: November 28, 2024